Dock Builders in the Florida Keys
A pier dock in unincorporated Monroe County can't run longer than twice your shoreline frontage or 100 feet. It also can't take more than ten percent of the canal.
Get a free match
Call or text (645) 300-7513
Call now or send a text with your address and what you need.
How long can a pier dock be?
Whichever is less, measured from mean low water. Here's the whole subsection.
(15) Pier type docks. Pier type docks shall be permitted provided that:
a. Such structures are oriented approximately perpendicular to the shoreline;
b. Such structures are located in an existing break in the mangroves or shoreline vegetation; however, if no such break exists, a walkway no more than four (4) feet in width, may be cut through the mangroves or shoreline vegetation;
c. Such structures are located such that no portion of the dock (including the terminal platform and mooring facilities) is less than five (5) feet from the side property lines as extended into the water perpendicular to the shore;
d. Such structures do not exceed four (4) feet in width, except for a terminal platform, as allowed by subsection (m)(15)f;
e. Such structures are no longer than twice the linear shoreline frontage of the parcel or 100 feet, whichever is less. For purposes of this subsection (m)(15)e., dock length shall be measured from MLW out to the waterward extension of the dock. A special exception may be granted by the Planning and Environmental Resources Director to allow the minimum relaxation of this length restriction as is necessary to provide the upland owner with access to adequate water depths specified for docking facilities. Such special exceptions shall only be granted based on a written determination that, among other criteria, the proposed dock will not be inconsistent with community character, will not interfere with public recreational uses in or on adjacent waters, and will pose no navigational or safety hazard. At least 30 calendar days prior to the issuance of a county permit issued under such a special exception, the Planning and Environmental Resources Director shall ensure that shoreline property owners within 300 feet of the subject parcel are notified by regular mail of the proposed special exception in order to allow an opportunity for appeal; and
f. If proposed, the terminal platform is no wider than eight (8) feet in one dimension and does not exceed a total of 160 square feet in area. The terminal platform shall be constructed of grated materials to allow the maximum amount of sunlight infiltration to the water under the platform. The terminal platform may include stairways for swimming access, provided that all stairways are contained within the square footage allowed for the terminal platform. The terminal platform may include a non-enclosed gazebo that does not exceed 100 square feet in area and the highest portion of the roof shall be no more than 12 feet above the decking or terminal platform level.
How wide is your canal at low tide?
The County Biologist picks the two mean low water points. Ten percent of the gap is your limit.
(m) Docking facilities. Docking facilities shall be permitted, provided that:
(1) Permit. All required permits from the Florida Department of Environmental Protection and Army Corps of Engineers shall be obtained prior to commencement of construction and/or issuance of a County permit or 'Notice to Proceed.'
(2) Width. Docks shall not exceed ten percent (10%) of the width of the waterbody as measured laterally across the waterbody from the point of mean low water (MLW) of the proposed location of placement, prior to construction of any dock, to the opposing point of mean low water, prior to construction of any dock. The County Biologist shall use the best available data to determine the point of MLW prior to construction of docks. Along open water shorelines adjacent to manmade waterways where no breakwater, rip-rap, or structure(s) exists along the outside of the waterway, the opposing point of mean low water shall be measured as the edge of the lawfully dredged area.
Where can the boat sit?
Four feet of water again, and more over grass.
(7) Location of boat mooring on docking facilities. Except as specified in Section 118-12(m)(6)b, moored vessels and mooring facilities attached to docking facilities shall not be located in less than four feet water depth at MLW. If a moored vessel and/or mooring facility attached to a docking facility is located over seagrass beds or hardbottom communities, it may only be permitted where the water depth is at least four feet above the top of all seagrasses, corals, macro algae, sponges, or other sessile organisms at MLW and continuous access to open water is available.
(8) Navigation interference. All docking facilities shall be constructed so as not to interfere with normal navigation or reasonable access to adjacent docks or moorings.
Before you ask for quotes
Monroe County dock rules has the piling sleeves and the depth exceptions.
Building a dock over seagrass is the one to read if the bottom is green.
Dock construction questions has the state exemption and Key West.