Monroe County dock rules start with two numbers. Ten percent of the waterway's width, and four feet of water at mean low water. Is your canal narrow? Do the width math first.

Get a free match

Width is measured before the dock goes in

The County Biologist decides where mean low water is on each side. Your dock gets ten percent of the distance between.

(m) Docking facilities. Docking facilities shall be permitted, provided that:

(1) Permit. All required permits from the Florida Department of Environmental Protection and Army Corps of Engineers shall be obtained prior to commencement of construction and/or issuance of a County permit or 'Notice to Proceed.'

(2) Width. Docks shall not exceed ten percent (10%) of the width of the waterbody as measured laterally across the waterbody from the point of mean low water (MLW) of the proposed location of placement, prior to construction of any dock, to the opposing point of mean low water, prior to construction of any dock. The County Biologist shall use the best available data to determine the point of MLW prior to construction of docks. Along open water shorelines adjacent to manmade waterways where no breakwater, rip-rap, or structure(s) exists along the outside of the waterway, the opposing point of mean low water shall be measured as the edge of the lawfully dredged area.

Monroe County Code, Sec. 118-12(m), (m)(1) and (m)(2). Copied Nov 21, 2026 from a public copy of the code.

Water depth and piling sleeves

(6) Required conditions. Any docking facility shall meet the following conditions:

a. All pilings associated with the construction of any dock shall be non-CCA-leaching (recycled plastic, concrete) or be wrapped with impermeable plastic or PVC sleeves. Impermeable plastic or PVC sleeves shall have a minimum of 30 millimeter thickness and shall extend from at least 6 inches below the level of the substrate to at least 2 feet above the mean high water line.

b. Docking facilities that do not terminate over seagrass beds or hardbottom communities must have at least four feet (4ft) of water depth at MLW at the terminal end of the docking facility, and continuous access to open water. A benthic survey shall be submitted to document the presence or absence of seagrass beds and/or hardbottom communities;

c. A docking facility that extends across a full ten percent of the width of any body of water may terminate in water less than four feet (4ft) at MLW if this water depth occurs within five horizontal feet of the terminal end of the docking facility such that the centerline of an average vessel will rest in water of adequate depth, and continuous access to open water is available;

d. Docking facilities may be developed on the shoreline of lots in a subdivision that was approved before September 15, 1986, if the docking facility is located in a channel or canal that was dredged before September 15, 1986, and if there is a MLW depth of at least four feet (4ft) at the terminal end of the docking facility. Such docks shall not exceed ten percent of the width of the channel or canal; and

Monroe County Code, Sec. 118-12(m)(6)a. to d., Required conditions. Copied Nov 21, 2026 from a public copy of the code.

Item e. is about seagrass and hardbottom. It's on the seagrass page.

Where the boat sits

(7) Location of boat mooring on docking facilities. Except as specified in Section 118-12(m)(6)b, moored vessels and mooring facilities attached to docking facilities shall not be located in less than four feet water depth at MLW. If a moored vessel and/or mooring facility attached to a docking facility is located over seagrass beds or hardbottom communities, it may only be permitted where the water depth is at least four feet above the top of all seagrasses, corals, macro algae, sponges, or other sessile organisms at MLW and continuous access to open water is available.

(8) Navigation interference. All docking facilities shall be constructed so as not to interfere with normal navigation or reasonable access to adjacent docks or moorings.

Monroe County Code, Sec. 118-12(m)(7) and (m)(8). Copied Nov 21, 2026 from a public copy of the code.